![](https://secondchancefoods.org/wp-content/uploads/2024/02/Blog-Headers-13-1024x555.png)
New Facility Improvement Updates
Fresh Paint, Wet Concrete & a Bright Vision for the Future
View all the improvements happening at our soon-to-be new home!
Our new facility has undergone a remarkable transformation since we began renovations. We knew this new space would create the opportunity to do more. But, these improvements have truly solidified our vision of what will be possible in the new chapter and opened up new possibilities we can’t wait to explore with you. Despite the usual obstacles that happen during construction, we’re incredibly excited to share the thrilling updates with you as we continue to update our future facility!
![ladder with pvc pipes below fill a back room warehouse](https://secondchancefoods.org/wp-content/uploads/2024/02/10-768x768.png)
![open garage door before renovations](https://secondchancefoods.org/wp-content/uploads/2024/02/1-768x768.png)
![Installed garage door closed](https://secondchancefoods.org/wp-content/uploads/2024/02/2-1-768x768.png)
![Opening up space for the warehouse](https://secondchancefoods.org/wp-content/uploads/2024/02/3-1-768x768.png)
![We can drive right in to the warehouse!](https://secondchancefoods.org/wp-content/uploads/2024/02/26-768x768.png)
![Demo of main waste pipe](https://secondchancefoods.org/wp-content/uploads/2024/02/24-768x768.png)
![Plumbing in progress (now complete)](https://secondchancefoods.org/wp-content/uploads/2024/02/25-768x768.png)
![ADA Compliant bathroom](https://secondchancefoods.org/wp-content/uploads/2024/02/23-768x768.png)
![Bathroom walls framed (now drywalled)](https://secondchancefoods.org/wp-content/uploads/2024/02/22-768x768.png)
![Cooler installed on fresh concrete pad](https://secondchancefoods.org/wp-content/uploads/2024/02/16-768x768.png)
![Old sink removed and new concrete pad](https://secondchancefoods.org/wp-content/uploads/2024/02/15-768x768.png)
![Future food donation sorting and packing of our Community Supported Nutrition Boxes](https://secondchancefoods.org/wp-content/uploads/2024/02/14-768x768.png)
![pre demo hallway](https://secondchancefoods.org/wp-content/uploads/2024/02/10-1-768x768.png)
![Fresh paint does wonders!](https://secondchancefoods.org/wp-content/uploads/2024/02/11-768x768.png)
![wall with painted updates and tools around](https://secondchancefoods.org/wp-content/uploads/2024/02/9-768x768.png)
![Fresh paint and posters on walls](https://secondchancefoods.org/wp-content/uploads/2024/02/12-768x768.png)
![hallway with walk-in cooler and walll](https://secondchancefoods.org/wp-content/uploads/2024/02/4-768x768.png)
![Demo in progress](https://secondchancefoods.org/wp-content/uploads/2024/02/5-1-768x768.png)
![Veggie wash station!](https://secondchancefoods.org/wp-content/uploads/2024/02/6-1-768x768.png)
Newest Floor Plans!
![schematic of floor layout with labels](https://secondchancefoods.org/wp-content/uploads/2024/02/Screenshot-2024-02-14-at-5.26.34-PM-757x1024.png)
One of the most exciting parts of moving spaces is the opportunity this brings our operations to improve. From where things are kept to how volunteers and staff work and move in the space – we’re ensuring we take the time to optimize space for a higher performing and more enjoyable experience.
Perks of Our New Home
More space! 4,550 sq ft compared to our old space which was 3,000 sq ft
Food Preparation and the Sorting / Delivery operations can be run simultaneously.
All deliveries and shipping done indoors
Increased electrified work surface area
Increased stove top and convection oven capacity
Dedicated vegetable processing area.
Increased pantry square footage
Dedicated meal packaging area and dedicated client sorting and packaging area with dedicated refrigeration.
In house washer and dryer.
Increased refrigeration and freezer capacity.
Increased storage shelving for less often used equipment.